{"id":98504,"date":"2025-07-10T15:09:19","date_gmt":"2025-07-10T15:09:19","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=98504"},"modified":"2025-07-10T15:09:20","modified_gmt":"2025-07-10T15:09:20","slug":"fortalecen-suministro-electrico-para-mas-de-120-mil-tachirenses","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=98504","title":{"rendered":"Fortalecen suministro el\u00e9ctrico para m\u00e1s de 120 mil tachirenses"},"content":{"rendered":"\n<p><strong>Estado T\u00e1chira.- <\/strong>La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) realiz\u00f3 labores de mantenimiento integral en las subestaciones San Joaqu\u00edn 34,5 kV y Orope 34,5\/13,8 kV, garantizando el suministro el\u00e9ctrico a m\u00e1s de 120 mil habitantes del estado T\u00e1chira.<\/p>\n\n\n\n<p>En la subestaci\u00f3n Orope, ubicada en el municipio Garc\u00eda de Hevia, se ejecutaron maniobras t\u00e9cnicas que incluyeron la instalaci\u00f3n de seis puentes con sus respectivas barracudas, tres barras reconectadoras y conectores, lo que asegura el funcionamiento del sistema el\u00e9ctrico en la zona norte.<\/p>\n\n\n\n<p>Asimismo, en la subestaci\u00f3n San Joaqu\u00edn, situada en el municipio Fern\u00e1ndez Feo, se mejor\u00f3 el servicio el\u00e9ctrico en la zona sur mediante la instalaci\u00f3n de un cortacorriente, un seccionador en el primer punto del circuito Nula 34,5 kV y un polo disyuntor, lo que se traduce en mayor bienestar para la poblaci\u00f3n.<\/p>\n\n\n\n<p>Estas acciones reafirman el compromiso de CORPOELEC con el pueblo venezolano y aseguran la recuperaci\u00f3n continua del Sistema El\u00e9ctrico Nacional (SEN).<\/p>\n\n\n\n<p><strong>Prensa MPPEE &#8211; CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado T\u00e1chira.- La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) realiz\u00f3 labores de mantenimiento integral en las subestaciones San Joaqu\u00edn 34,5 kV y<\/p>\n","protected":false},"author":24,"featured_media":98514,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,2704,3112,3111,2700],"class_list":["post-98504","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-mantenimiento","tag-orope","tag-san-joaquin","tag-tachira"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/98504","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=98504"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/98504\/revisions"}],"predecessor-version":[{"id":98505,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/98504\/revisions\/98505"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/98514"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=98504"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=98504"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=98504"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}