{"id":98713,"date":"2025-07-16T16:19:33","date_gmt":"2025-07-16T16:19:33","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=98713"},"modified":"2025-07-16T16:19:35","modified_gmt":"2025-07-16T16:19:35","slug":"mejoras-en-la-linea-tigre-i-furrial-ii-a-230-kv-fortalecen-servicio-electrico-en-el-oriente","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=98713","title":{"rendered":"Mejoras en la l\u00ednea Tigre I \u2013 Furrial II a 230\u202fkV fortalecen servicio el\u00e9ctrico en el oriente"},"content":{"rendered":"\n<p><strong>Estado Monagas.-<\/strong> Con el objetivo de fortalecer el sistema de transmisi\u00f3n en la regi\u00f3n oriental del pa\u00eds, la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) ejecut\u00f3 labores de mantenimiento preventivo en la l\u00ednea Tigre I \u2013 Furrial II a 230\u202fkV, ubicada al oeste del estado Monagas.<\/p>\n\n\n\n<p>La intervenci\u00f3n se centr\u00f3 en las torres 324, 332 y 335, donde se sustituyeron cadenas de aisladores de vidrio en las fases S y T. Estas acciones garantizan que los conductores se mantengan correctamente posicionados y resistentes frente al flujo de energ\u00eda, lo que asegura mayor estabilidad y confiabilidad en el suministro.<\/p>\n\n\n\n<p>Este mantenimiento forma parte de las estrategias operativas para elevar las condiciones del Sistema El\u00e9ctrico Nacional (SEN) y responde a las pol\u00edticas p\u00fablicas promovidas por el Gobierno Bolivariano, dirigido por el presidente de la Rep\u00fablica, Nicol\u00e1s Maduro, para ofrecer un servicio eficiente y continuo a la poblaci\u00f3n venezolana.<\/p>\n\n\n\n<p><strong>Prensa MPPEE &#8211; CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Monagas.- Con el objetivo de fortalecer el sistema de transmisi\u00f3n en la regi\u00f3n oriental del pa\u00eds, la Corporaci\u00f3n El\u00e9ctrica<\/p>\n","protected":false},"author":24,"featured_media":98714,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,3144,2704,2703,3143],"class_list":["post-98713","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-furrial-ii","tag-mantenimiento","tag-monagas","tag-tigre-i"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/98713","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=98713"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/98713\/revisions"}],"predecessor-version":[{"id":98715,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/98713\/revisions\/98715"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/98714"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=98713"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=98713"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=98713"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}