{"id":98818,"date":"2025-07-19T16:09:22","date_gmt":"2025-07-19T16:09:22","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=98818"},"modified":"2025-07-19T16:09:24","modified_gmt":"2025-07-19T16:09:24","slug":"fortalecen-lineas-de-transmision-en-guarico-con-mantenimiento-especializado","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=98818","title":{"rendered":"Fortalecen l\u00edneas de transmisi\u00f3n en Gu\u00e1rico con mantenimiento especializado"},"content":{"rendered":"\n<p><strong>Estado Gu\u00e1rico.-<\/strong> La <a href=\"https:\/\/www.instagram.com\/corpoelecinfo\/\" data-type=\"link\" data-id=\"https:\/\/www.instagram.com\/corpoelecinfo\/\">Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC)<\/a> realiz\u00f3 trabajos especializados en l\u00edneas de transmisi\u00f3n de alta tensi\u00f3n en el estado Gu\u00e1rico, asegurando una operatividad m\u00e1s segura y eficiente.<\/p>\n\n\n\n<p>Las cuadrillas t\u00e9cnicas ejecutaron la sustituci\u00f3n de cadenas de aisladores en la torre 41 de la l\u00ednea Sombrero II \u2013 Calabozo I de 115 kV, acci\u00f3n que contribuye a garantizar la estabilidad del suministro el\u00e9ctrico.<\/p>\n\n\n\n<p>Asimismo, se llevaron a cabo inspecciones en la l\u00ednea El Tigre \u2013 San Ger\u00f3nimo A de 400 kV, cumpliendo con los protocolos de seguridad exigidos para operaciones en sistemas de alta tensi\u00f3n. <\/p>\n\n\n\n<p>La revisi\u00f3n detallada de aisladores permiti\u00f3 detectar puntos cr\u00edticos y coordinar maniobras preventivas que refuerzan la confiabilidad del proceso de transmisi\u00f3n.<\/p>\n\n\n\n<p>Estas acciones reafirman el compromiso del Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica (MPPEE), a trav\u00e9s de CORPOELEC, con el bienestar de la poblaci\u00f3n venezolana y con el fortalecimiento continuo del SEN bajo criterios de eficiencia y seguridad.<\/p>\n\n\n\n<p><strong>Prensa MPPEE &#8211; CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Gu\u00e1rico.- La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) realiz\u00f3 trabajos especializados en l\u00edneas de transmisi\u00f3n de alta tensi\u00f3n en el estado<\/p>\n","protected":false},"author":24,"featured_media":98819,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,2729,2704,2798],"class_list":["post-98818","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-guarico","tag-mantenimiento","tag-transmision"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/98818","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=98818"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/98818\/revisions"}],"predecessor-version":[{"id":98820,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/98818\/revisions\/98820"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/98819"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=98818"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=98818"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=98818"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}