{"id":98884,"date":"2025-07-22T09:02:00","date_gmt":"2025-07-22T09:02:00","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=98884"},"modified":"2025-07-25T19:05:37","modified_gmt":"2025-07-25T19:05:37","slug":"aplican-mantenimiento-preventivo-a-red-electrica-en-las-clavellinas-de-guarenas","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=98884","title":{"rendered":"Aplican mantenimiento preventivo a red el\u00e9ctrica en Las Clavellinas de Guarenas"},"content":{"rendered":"\n<p><strong>Estado Miranda.-<\/strong> Cuadrillas de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) realizaron mantenimiento correctivo en el circuito B9 de la subestaci\u00f3n Trapichito de Guarenas, garantizando la continuidad del servicio para 9.825 usuarios del municipio Plaza, en el estado Miranda.<\/p>\n\n\n\n<p>Entre los trabajos ejecutados en la calle Los Ba\u00f1os del sector Las Clavellinas, est\u00e1 la sustituci\u00f3n de un poste de media tensi\u00f3n de 12 metros de altura, como respuesta a solicitudes de los usuarios.<\/p>\n\n\n\n<p>Gracias a esta sustituci\u00f3n, el sistema de distribuci\u00f3n de energ\u00eda contin\u00faa su operatividad para el circuito, impactando positivamente en los sectores El Torre\u00f3n, Las Palmas, Mirador, parte alta de Ruiz Pineda y Las Clavellinas.<\/p>\n\n\n\n<p>Estos trabajos son parte del Plan de Adecuaci\u00f3n y Mantenimiento de Subestaciones y Circuitos El\u00e9ctricos, que llevan a cabo el Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica (MPPEE) y CORPOELEC para robustecer el servicio en la naci\u00f3n.<\/p>\n\n\n\n<p><strong>Prensa MPPEE &#8211; CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Miranda.- Cuadrillas de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) realizaron mantenimiento correctivo en el circuito B9 de la subestaci\u00f3n Trapichito<\/p>\n","protected":false},"author":24,"featured_media":99098,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,2810,3170,2709],"class_list":["post-98884","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-guarenas","tag-las-clavellinas","tag-miranda"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/98884","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=98884"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/98884\/revisions"}],"predecessor-version":[{"id":99099,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/98884\/revisions\/99099"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/99098"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=98884"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=98884"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=98884"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}