{"id":99024,"date":"2025-07-24T20:00:00","date_gmt":"2025-07-24T20:00:00","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=99024"},"modified":"2025-07-25T18:48:49","modified_gmt":"2025-07-25T18:48:49","slug":"avanza-plan-de-mantenimiento-a-circuitos-de-distribucion-de-energia-en-miranda","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=99024","title":{"rendered":"Avanza Plan de Mantenimiento a Circuitos de Distribuci\u00f3n de Energ\u00eda en Miranda"},"content":{"rendered":"\n<p><strong>Estado Miranda.- <\/strong>La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) avanza en el mantenimiento a la red el\u00e9ctrica del estado Miranda&nbsp; con la atenci\u00f3n de 20 circuitos de distribuci\u00f3n de energ\u00eda 13.8 kV, en beneficio de 230 mil usuarios.<\/p>\n\n\n\n<p>En los corredores de l\u00edneas de los ejes Barlovento y Valles del Tuy los operarios adecuaron y sustituyeron cortacorrientes, pararrayos, aisladores y copas, cables y conductores, abrazaderas, crucetas, herrajes, conectores y seccionadores.<\/p>\n\n\n\n<p>Con estos mantenimientos preventivos, correctivos y programados realizados durante el mes de julio, la Corporaci\u00f3n El\u00e9ctrica garantiza continuidad de energ\u00eda y un servicio el\u00e9ctrico eficiente.<\/p>\n\n\n\n<p>El Plan de Adecuaci\u00f3n y Mantenimiento de Circuitos y Subestaciones El\u00e9ctricas es un programa de activaci\u00f3n constante, para fortalecer el Sistema El\u00e9ctrico Nacional (SEN).<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Miranda.- La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) avanza en el mantenimiento a la red el\u00e9ctrica del estado Miranda&nbsp; con la<\/p>\n","protected":false},"author":22,"featured_media":99047,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,2709,11,2744,46],"class_list":["post-99024","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-miranda","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/99024","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=99024"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/99024\/revisions"}],"predecessor-version":[{"id":99048,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/99024\/revisions\/99048"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/99047"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=99024"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=99024"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=99024"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}