{"id":99195,"date":"2025-07-28T17:36:03","date_gmt":"2025-07-28T17:36:03","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=99195"},"modified":"2025-07-28T19:14:47","modified_gmt":"2025-07-28T19:14:47","slug":"corpoelec-desmaleza-mas-de-123-mil-metros-cuadrados-en-subestaciones-de-barinas","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=99195","title":{"rendered":"Desmalezan m\u00e1s de 123 mil metros cuadrados en subestaciones de Barinas"},"content":{"rendered":"\n<p><strong>Estado Barinas.- <\/strong>Los trabajadores de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) realizaron jornadas de desmalezamiento preventivo en 123.900 metros cuadrados en las subestaciones el\u00e9ctricas del estado Barinas.<\/p>\n\n\n\n<p>\u200eLos trabajos permitieron la adecuaci\u00f3n de cortafuegos, patios de transformaci\u00f3n, caminer\u00edas y cercas perimetrales de las importantes instalaciones del Sistema El\u00e9ctrico Nacional (SEN).<\/p>\n\n\n\n<p>\u200eEstas labores forman parte de las iniciativas impulsadas por el Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica (MPPEE), con el objetivo de optimizar el proceso de transmisi\u00f3n y asegurar un servicio confiable para m\u00e1s de 900 mil usuarios.<\/p>\n\n\n\n<p>\u200eEl esfuerzo sostenido de CORPOELEC como acci\u00f3n fundamental para mantener las infraestructuras en \u00f3ptimas condiciones, demuestran el compromiso del Gobierno Bolivariano con la estabilidad del SEN y la calidad de vida de los barinenses, garantizando que la energ\u00eda llegue a cada hogar y sector productivo del territorio venezolano.<\/p>\n\n\n\n<p><strong>\u200ePrensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Barinas.- Los trabajadores de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) realizaron jornadas de desmalezamiento preventivo en 123.900 metros cuadrados en<\/p>\n","protected":false},"author":24,"featured_media":99196,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2698,2691,2704,11,2744,46],"class_list":["post-99195","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-barinas","tag-corpoelec","tag-mantenimiento","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/99195","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=99195"}],"version-history":[{"count":2,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/99195\/revisions"}],"predecessor-version":[{"id":99199,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/99195\/revisions\/99199"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/99196"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=99195"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=99195"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=99195"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}