{"id":99251,"date":"2025-07-30T15:23:51","date_gmt":"2025-07-30T15:23:51","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=99251"},"modified":"2025-07-30T15:23:53","modified_gmt":"2025-07-30T15:23:53","slug":"corpoelec-optimiza-suministro-electrico-en-el-centro-de-tinaquillo-2","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=99251","title":{"rendered":"CORPOELEC optimiza suministro el\u00e9ctrico en el centro de Tinaquillo"},"content":{"rendered":"\n<p><strong>Estado Cojedes.- <\/strong>En atenci\u00f3n a una solicitud canalizada a trav\u00e9s de la L\u00ednea VenApp, la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) ejecut\u00f3 maniobras t\u00e9cnicas para optimizar el suministro de energ\u00eda en el centro de Tinaquillo, beneficiando a 90 usuarios residenciales y comerciales.<\/p>\n\n\n\n<p>El personal especializado sustituy\u00f3 y adecu\u00f3 equipos y componentes el\u00e9ctricos, logrando normalizar el banco de transformaci\u00f3n de 3&#215;50 kVA ubicado en la avenida Miranda, cruce con calle P\u00e1ez.<\/p>\n\n\n\n<p>Al respecto, Leonardo L\u00f3pez, comerciante de la zona, destac\u00f3 el impacto positivo del despliegue en el bienestar de la comunidad y el desarrollo de actividades econ\u00f3micas. <\/p>\n\n\n\n<p>\u00abExcelente la calidad de respuesta y la gesti\u00f3n por parte del equipo de CORPOELEC. Gracias a esta atenci\u00f3n r\u00e1pida se pudo restablecer el servicio el\u00e9ctrico y as\u00ed la continuidad de nuestras labores\u00bb, puntualiz\u00f3.<\/p>\n\n\n\n<p>En articulaci\u00f3n con el Poder Popular, el Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica, a trav\u00e9s de CORPOELEC, avanza en la ejecuci\u00f3n de acciones orientadas a garantizar un servicio el\u00e9ctrico confiable y eficiente en el territorio nacional.<\/p>\n\n\n\n<p><strong>Prensa MPPEE &#8211; CORPOELEC<\/strong><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Cojedes.- En atenci\u00f3n a una solicitud canalizada a trav\u00e9s de la L\u00ednea VenApp, la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) ejecut\u00f3<\/p>\n","protected":false},"author":24,"featured_media":99252,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2710,2691,2752,3197,2868],"class_list":["post-99251","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-cojedes","tag-corpoelec","tag-servicio","tag-tinaquillo","tag-venapp"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/99251","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=99251"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/99251\/revisions"}],"predecessor-version":[{"id":99253,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/99251\/revisions\/99253"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/99252"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=99251"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=99251"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=99251"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}