{"id":99618,"date":"2025-08-15T14:05:53","date_gmt":"2025-08-15T14:05:53","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=99618"},"modified":"2025-08-15T14:05:54","modified_gmt":"2025-08-15T14:05:54","slug":"corpoelec-realiza-maniobras-correctivas-en-la-subestacion-higuerote-ii","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=99618","title":{"rendered":"CORPOELEC realiza maniobras correctivas en la subestaci\u00f3n Higuerote II"},"content":{"rendered":"\n<p><strong>Estado Miranda.- <\/strong>La<a href=\"https:\/\/www.instagram.com\/corpoelecinfo\/\" data-type=\"link\" data-id=\"https:\/\/www.instagram.com\/corpoelecinfo\/\"> Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC)<\/a> ejecut\u00f3 labores de mantenimiento preventivo y correctivo en la subestaci\u00f3n Higuerote II, como parte de las acciones destinadas al fortalecimiento del sistema el\u00e9ctrico en el estado Miranda.<\/p>\n\n\n\n<p>Los operarios especializados en Mantenimiento de Subestaciones y Protecciones El\u00e9ctricas realizaron maniobras en barra y p\u00f3rtico en 34.5 kV, as\u00ed como la correcci\u00f3n de puntos calientes en los seccionadores. Estas acciones se llevaron a cabo mediante detecci\u00f3n termogr\u00e1fica, t\u00e9cnica que permite identificar sobrecalentamientos y temperaturas anormales en los equipos.<\/p>\n\n\n\n<p>Para el desarrollo de estas labores, fueron despejados los circuitos Carenero, Curiepe, Higuerote II y PDVSA, lo que permiti\u00f3 ejecutar mejoras en los conductores de salida de l\u00ednea, sustituir seccionadores de transferencia, medir el esquema de apertura y cierre, y optimizar el sistema de protecciones, resguardando as\u00ed los equipos de potencia.<\/p>\n\n\n\n<p>Con estas acciones, CORPOELEC avanza en la consolidaci\u00f3n de un suministro el\u00e9ctrico m\u00e1s eficiente y confiable, orientado a mejorar la calidad de vida de los habitantes de Higuerote, Curiepe y Tacarigua.<\/p>\n\n\n\n<p><strong>Prensa MPPEE &#8211; CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Miranda.- La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) ejecut\u00f3 labores de mantenimiento preventivo y correctivo en la subestaci\u00f3n Higuerote II, como<\/p>\n","protected":false},"author":24,"featured_media":99619,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[3090,3245,2709],"class_list":["post-99618","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-brion","tag-higuerote-ii","tag-miranda"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/99618","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=99618"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/99618\/revisions"}],"predecessor-version":[{"id":99620,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/99618\/revisions\/99620"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/99619"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=99618"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=99618"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=99618"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}