{"id":99991,"date":"2025-08-27T14:59:10","date_gmt":"2025-08-27T14:59:10","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=99991"},"modified":"2025-08-27T14:59:12","modified_gmt":"2025-08-27T14:59:12","slug":"mas-de-195-mil-usuarios-beneficiados-con-atencion-integral-en-redes-electricas-en-el-municipio-cabimas","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=99991","title":{"rendered":"M\u00e1s de 195 mil usuarios beneficiados con atenci\u00f3n\u00a0 integral en redes el\u00e9ctricas en el municipio Cabimas"},"content":{"rendered":"\n<p><strong>Estado Zulia.-<\/strong>La Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec), a trav\u00e9s de la fuerza trabajadora realiza la atenci\u00f3n integral a las comunidades cumpliendo&nbsp;&nbsp;con un programa de mantenimiento, beneficiando a m\u00e1s de 195 mil usuarios del municipio Cabimas.<\/p>\n\n\n\n<p>Las labores iniciaron con instalacio de 37 equipos nuevos en las redes el\u00e9ctricas tales como, seccionadores, bancos de capacitadores en las&nbsp; parroquias Ambrosio, R\u00f3mulo Betancourt, Jorge Hern\u00e1ndez y Carmen Herrera.<\/p>\n\n\n\n<p>De igual forma, se benficiaron las comunidades, Los M\u00e9danos, Sim\u00f3n Bol\u00edvar, Guabina y La Pe\u00f1a con los trabajos de remplazo de cortadores, pararrayos y la instalaci\u00f3n de cinco transformadores&nbsp;capacidades 37.5, 50 y 100kVA.<\/p>\n\n\n\n<p>Estas acciones a trav\u00e9s del Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica se traducen en una mejora significativa en la calidad del servicio el\u00e9ctrico para los habitantes del estado Zulia.<\/p>\n\n\n\n<p><strong>Prensa MPPEE \u2013 CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Zulia.-La Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec), a trav\u00e9s de la fuerza trabajadora realiza la atenci\u00f3n integral a las comunidades cumpliendo&nbsp;&nbsp;con<\/p>\n","protected":false},"author":22,"featured_media":99992,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,11,2744,46,2694],"class_list":["post-99991","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-mppee","tag-sen","tag-venezuela","tag-zulia"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/99991","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=99991"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/99991\/revisions"}],"predecessor-version":[{"id":99993,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/99991\/revisions\/99993"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/99992"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=99991"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=99991"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=99991"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}